Topic: Coal Road |
---|
1. Author: Raymie the Legend Date: Thu 15th May 2025. 22:32 Shut for ten days causing jams through the town. Potholes filled in. Looks like someone has chucked some tar in and used the back of a shovel to smooth it out. Absolute disgrace. Will be f***** again in a month. ![]() It`s bloody tough being a legend Ron Atkinson - 1983 Reply |
2. Author: jake89 Date: Thu 15th May 2025. 23:28 I thought the issue was related to the stability of the road rather than potholes? That road hasn`t been fit for purpose for years but my understanding is it can`t be widened as the walls are protected. It`s going to be interesting when the Western Relief road is built as it appears to connect to the coal road! Reply |
3. Author: FifeEternal Date: Fri 16th May 2025. 11:20 If you actually check the road closures site, it was SP Energy works on Lover`s Loan, not the pot holes for this 10 day closure. They were badly filled in a week or so before this latest closure. Bit of rain and they`ll be back to the usual standard. Reply |
4. Author: Bletchley_Par Date: Fri 16th May 2025. 19:12 I cycled through the roadworks on lover`s loan on Sunday to get on the Urquart Farm road, there was a big 30 foot trench in the middle of it. Not just fixing potholes. ![]() Reply |